Allied Telesis AT-SBX81XS6 Guía de instalación Pagina 192

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 314
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 191
Chapter 9: Powering On the Chassis
192 Section II: Installing the Chassis
Figure 131. Tightening the Handle Locking Screw
9. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
10. Connect the power wires to the circuit breaker.
11. Turn the circuit breaker on.
12. Turn the On/Off switch on the power supply to the On position. See
Figure 118 on page 180.
13. Do one of the following:
If the chassis has two AT-SBxPWRSYS1 DC Power Supplies,
repeat this procedure to power on the second power supply.
Otherwise, go to “Monitoring the Initialization Process” on
page 197.
Handle locking
screw
Vista de pagina 191
1 2 ... 187 188 189 190 191 192 193 194 195 196 197 ... 313 314

Comentarios a estos manuales

Sin comentarios