Allied-telesis SwitchBlade x8106 Manual de usuario Pagina 96

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 95
Chapter 4: Installing the Power Supplies
96
7. Lower the power supply locking handle to secure the power supply to
the chassis, as shown in Figure 52.
Figure 52. Lowering the Handle on the AT-SBxPWRSYS1 Power Supply
8. To install a second AT-SBxPWRSYS1 Power Supply, repeat this
procedure.
After installing the AT-SBxPWRSYS1 Power Supples, do one of the
following:
If you purchased the AT-SBxPWRPOE1 Power Supply for the ports on
the AT-SBx81GP24 PoE Line Cards, go to “Installing the AT-
SBxPWRPOE1 PoE Power Supply” on page 97.
Otherwise, go to Chapter 5, “Installing the AT-SBx81CFC400
Controller and Ethernet Line Cards” on page 109.
Note
Retain the tie wrap that comes with the power supply. You will use it
to secure the power cord to the chassis when you power on the unit
in “Powering On the AT-SBxPWRSYS1 AC Power Supply” on
page 145.
Vista de pagina 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 239 240

Comentarios a estos manuales

Sin comentarios