Allied-telesis SwitchBlade x8106 Manual de usuario Pagina 86

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 85
Chapter 3: Installing the Chassis in an Equipment Rack
86
Removing the Shipping Brace
Now that the chassis is installed in the equipment rack, you may remove
the shipping brace from the front of the unit. To remove the shipping
brace, remove the six mounting screws with a #2 Phillips-head
screwdriver (not provided). Refer to Figure 40.
Figure 40. Removing the Shipping Brace
After removing the shipping plate, go to “Installing the Chassis Grounding
Lug” on page 87.
Shipping Brace Screws
Vista de pagina 85
1 2 ... 81 82 83 84 85 86 87 88 89 90 91 ... 239 240

Comentarios a estos manuales

Sin comentarios