Allied-telesis SwitchBlade x8106 Manual de usuario Pagina 181

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 180
181
Chapter 8
Verifying the Hardware Operations of
the Chassis
This chapter describes how to verify the operations of the chassis. The
chapter contains the following sections:
“Using the LEDs to Verify the Chassis” on page 182
“Using Local Management to Verify the Chassis” on page 184
Note
Allied Telesis recommends using both methods to confirm the
operations of the chassis, controller cards, and line cards.
Vista de pagina 180
1 2 ... 176 177 178 179 180 181 182 183 184 185 186 ... 239 240

Comentarios a estos manuales

Sin comentarios