Allied-telesis AT-SBx81CFC960 Manual de usuario Pagina 93

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 92
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis 93
3. Identify the lowest 1/2” screw hole pattern on the rack mounting rails
within the space reserved for the AT-SBx8106 Chassis.
4. Install one rack mount screw in each vertical rail, at the same height in
the top screw hole of the lowest 1/2” hole pattern, as shown in
Figure 31. The screws are used to support the chassis while you
secure it to the rack. Do not fully tighten the screws at this time. The
screw heads should protrude from the rack approximately 6.4 mm (.25
in).
Figure 31. Rack Mounting Hole Locations
5. After installing the two screws in the equipment rack, go to “Unpacking
the AT-SBx8106 Chassis” on page 94.
6.4 mm (.25 in)
Screw head
Top screw hole of the lowest 1/2” hole pattern
away from rack
Vista de pagina 92
1 2 ... 88 89 90 91 92 93 94 95 96 97 98 ... 321 322

Comentarios a estos manuales

Sin comentarios