Allied-telesis AT-SBx81CFC960 Manual de usuario Pagina 106

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 105
Chapter 5: Installing the Chassis in an Equipment Rack
106 Section II: Installing the Chassis
3. Insert one end of the grounding wire into the grounding lug, as shown
in Figure 44, and use a crimping tool to secure the wire to the
grounding lug.
Figure 44. Attaching the Grounding Wire to the Grounding Lug
4. Install the grounding lug on the rear panel of the chassis, as shown in
Figure 45.
Allied Telesis recommends tightening the screws to 20 inch-lbs.
Figure 45. Installing the Grounding Lug and Wire
5. Connect the other end of the grounding wire to the building protective
earth.
6. Go to Chapter 6, “Installing the Power Supplies” on page 107.
Vista de pagina 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 321 322

Comentarios a estos manuales

Sin comentarios