Allied-telesis AT-SBx81CFC960 Manual de usuario Pagina 194

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 193
Chapter 9: Powering On the Chassis
194 Section II: Installing the Chassis
Figure 137. Tightening the Handle Locking Screw
10. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
11. Connect the power wires to the circuit breaker.
12. Turn the circuit breaker on.
13. Turn the On/Off switch on the power supply to the On position. See
Figure 131 on page 188.
14. Do one of the following:
If the chassis has two AT-SBxPWRSYS1 DC Power Supplies,
repeat this procedure to power on the second power supply.
Otherwise, go to “Monitoring the Initialization Process” on
page 205.
Handle locking
screw
Vista de pagina 193
1 2 ... 189 190 191 192 193 194 195 196 197 198 199 ... 321 322

Comentarios a estos manuales

Sin comentarios