Allied-telesis AT-SBx81CFC960 Manual de usuario Pagina 200

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 199
Chapter 9: Powering On the Chassis
200 Section II: Installing the Chassis
Figure 144. Tightening the Handle Locking Screw
9. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
10. Connect the power wires to the circuit breaker.
11. Turn the circuit breaker on.
12. Turn the On/Off switch on the power supply to the On position. See
Figure 131 on page 188.
13. Do one of the following:
If the chassis has two AT-SBxPWRSYS1 DC Power Supplies,
repeat this procedure to power on the second power supply.
Otherwise, go to “Monitoring the Initialization Process” on
page 205.
Handle locking
screw
Vista de pagina 199
1 2 ... 195 196 197 198 199 200 201 202 203 204 205 ... 321 322

Comentarios a estos manuales

Sin comentarios