Allied-telesis AT-SBx81CFC960 Manual de usuario Pagina 126

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 125
Chapter 6: Installing the Power Supplies
126 Section II: Installing the Chassis
8. Lower the locking handle of the power supply module to secure the
module in the slot, as shown in Figure 66.
Figure 66. Locking the Handle on the AT-SBxPWRSYS1 DC System
Power Supply
Note
Do not tighten the handle locking screw yet. You may need to
slightly lift the handle to move the plastic guard panel when you
connect the positive and negative wires in “Powering On the AT-
SBxPWRSYS1 DC System Power Supply” on page 179.
9. To install a second AT-SBxPWRSYS1 DC System Power Supply,
repeat this procedure.
10. After installing the power supplies, go to Chapter 7, “Installing the AT-
SBx81CFC960 Controller and Ethernet Line Cards” on page 127.
Note
Retain the five wire ring lugs that come with the power supply. You
use them to wire the power supply in “Powering On the AT-
SBxPWRSYS1 DC System Power Supply” on page 179
Vista de pagina 125
1 2 ... 121 122 123 124 125 126 127 128 129 130 131 ... 321 322

Comentarios a estos manuales

Sin comentarios