Allied-telesis AT-SBx81CFC960 Manual de usuario Pagina 298

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 297
Chapter 15: Building a Stack
298 Section III: Building a Stack with VCStack Plus
Powering Off the Chassis
Now that you have configured the chassis, you should power it off. To
power off the unit, do one of the following:
If the chassis has the AT-SBxPWRSYS1 AC and AT-
SBxPWRPOE1 PoE power supplies, disconnect the AC power
cords from the connectors on the back panel of the unit or from the
power sources.
If the unit has the AT-SBxPWRSYS1 DC power supply, turn the
power switch on the power supply to off. Refer to Figure 62 on
page 124.
Be sure to power off all the power supplies in the chassis.
After powering off the chassis, do one of the following:
To configure the second chassis, go to “Configuring the Second
Chassis” on page 299
If you are finished configuring both chassis, go to “Installing and
Cabling the Stacking Transceivers” on page 300.
Note
Powering off the chassis to install the stacking transceivers is
optional. The transceivers are hot-swappable and can be installed
while the chassis is powered on. However, Allied Telesis
recommends that both chassis be powered off when you power on
the stack for the first time.
Note
If you decide not to power off the chassis, you must reset both units
with the REBOOT command in the Privileged Exec mode after
installing the stacking transceivers in “Installing and Cabling the
Stacking Transceivers” on page 300.
Vista de pagina 297
1 2 ... 293 294 295 296 297 298 299 300 301 302 303 ... 321 322

Comentarios a estos manuales

Sin comentarios