Allied Telesis AT-iMG7x6MOD series Manual de instalación Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
AT-iMG746MOD Installation Guide
18 Chapter 3: Installing the Gateway in the Enclosure
Connecting the Fiber Pigtail
Connect the pigtail (installed as part of the Enclosure installation procedure) to the WAN fiber port of the
electronics unit. Refer to Figure 8.
Connecting the Power Cord
The AT-iMGxx6MOD gateway is designed to be deployed with an uninterrupted power supply (UPS). You
can purchase a UPS from Allied Telesis (part number AT-iMG008/AT-iMG008G). Install the power supply
according to the manufacturer’s instructions included in the package.
Allied Telesis provides a 15 ft. power cable (part number AT-iMG646MOD-C01). Alternatively, you can
make custom length power cables. The power connectors (6-pin and 7-pin terminal blocks) are supplied with
the AT-iMG008/AT-iMG008G) UPS and the gateways. For lengths up to 50 ft., use three pair twisted wire
with a minimum 18 AWG. Figure 32 on page 49 provides a detailed wiring diagram.
To connect the power cord, perform the following procedure:
1. Remove the grommet from the power cord entrance, cut a 1/4” “X” in it, and put it back in place.
2. Slip the power cord through the grommet.
3. Connect the wires in the power cord to the DC terminal block in the accessory kit (the wiring diagram is
shown in Appendix A) at 4.5 in-lbs. Or, use the Allied Telesis power cord, model AT-iMG646MOD-C01
(not provided).
4. Plug the terminal block into the DC power socket, as shown in Figure 8.
5. If not using the console cable, seal the grommet
6. Tie-wrap the power cable, using one of the secure posts or the lower channel.
Figure 8. Plugging in the DC Terminal Block (Pigtail already installed)
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 55 56

Comentarios a estos manuales

Sin comentarios