Allied-telesis AT-S39 Manual de usuario Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 242
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
AT-S39 Users Guide
51
The window displays the current status of the switch at the end of
selection 1 - Switch State. For example, the switchs current
status in the figure above is Master.
Note
The 2 - Stacking Services selection in the window is available only
on master switches.
2. To change a switchs stacking status, type 1 to select Switch State.
The following prompt is displayed.
Enter new setup (M/S/U) ->
3. Type M to change the switch to a master switch, S to make it a slave
switch, or U to make the switch unavailable. Press Return.
4. Type S to select Save Configuration Changes.
A change to the status is immediately activated on the switch.
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 241 242

Comentarios a estos manuales

Sin comentarios