Allied-telesis AT-MCF2300 Manual de usuario Pagina 116

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 190
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 115
Chapter 14: Installing the AT-MCF2000S Stacking Module
116 Section II: Installation
2. Unpack the AT-MCF2000S Stacking module from its shipping
container and verify the package contents listed in Table 28.
Note
You should retain the packaging material in the event you need to
return the unit to Allied Telesis.
3. Assign the module a unique chassis ID number by setting the SW2
DIP switches. (For background information, refer to “Chassis ID
Numbers” on page 79 or the AT-S85 and AT-S97 Management
Software Command Line User’s Guide.) The ID number is set with
switches 1 to 5. Switch 6 is not used. If there is tape on the DIP
switches, remove the tape. To set the switches, use a pointed object,
such as the tip of a ball point pen. The settings are listed in Table 35
on page 179 and Table 36 on page 180, and in the table printed on the
module. For example, to assign the module the chassis ID number 4,
set DIP switches 1,2, 4, and 5 to on and switch 3 to off.
Table 28. AT-MCF2000S Module Items
Component Description
One AT-MCF2000S
Module
One Installation and User
Documentation CD or the
AT-MCF2000S Installation
Guide
A
T-MCF2000
S
ST
A
C
K
1
L
IN
KA
C
T
POR
T
ACT
IVITY
S
T
A
CK
2
C
H
ASSIS
ID
1264
1405
Stacking
Module
AT-MCF2000S
Installation
Guide
or
Vista de pagina 115
1 2 ... 111 112 113 114 115 116 117 118 119 120 121 ... 189 190

Comentarios a estos manuales

Sin comentarios