Allied-telesis SwitchBlade x8112 Manual de usuario Pagina 98

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 97
Chapter 4: Installing the Power Supplies
98
4. Check the model name, shown in Figure 52, to verify the module.
If the module is the AT-SBxPWRSYS1 System Power Supply, do not
continue with this procedure. Instead, perform “Installing the AT-
SBxPWRSYS1 AC System Power Supply” on page 89.
Figure 52. Verifying the AT-SBxPWRPOE1 PoE Power Supply
5. Raise the locking handle on the AT-SBxPWRPOE1 Power Supply, as
shown Figure 53.
Figure 53. Unlocking the Handle on the AT-SBxPWRPOE1 Power Supply
6. Align and insert the AT-SBxPWRPOE1 Module into slot A or B. See
Figure 54 on page 99.
Caution
The AT-SBxPWRPOE1 Power Supply will not work in slot C or D.
Vista de pagina 97
1 2 ... 93 94 95 96 97 98 99 100 101 102 103 ... 239 240

Comentarios a estos manuales

Sin comentarios