Allied-telesis SwitchBlade x8112 Manual de usuario Pagina 71

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 70
71
Chapter 3
Installing the Chassis in an Equipment
Rack
This chapter describes how to install the AT-SBx8112 Chassis in an
equipment rack. This chapter contains the following sections:
“Required Tools and Material” on page 72
“Preparing the Equipment Rack” on page 73
“Unpacking the AT-SBx8112 Chassis” on page 76
“Adjusting the Equipment Rack Brackets” on page 78
“Installing the AT-SBx8112 Chassis in the Equipment Rack” on
page 80
“Removing the Shipping Brace” on page 83
“Installing the Chassis Grounding Lug” on page 84
Vista de pagina 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 239 240

Comentarios a estos manuales

Sin comentarios