Allied-telesis SwitchBlade x8112 Manual de usuario Pagina 100

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 99
Chapter 4: Installing the Power Supplies
100
7. Lower the locking handle of the power supply module to secure the
module in the slot, as shown in Figure 55.
Figure 55. Locking the Handle on the AT-SBxPWRPOE1 Power Supply
8. To install a second AT-SBxPWRPOE1 Power Supply, repeat this
procedure.
9. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter
5, “Installing the AT-SBx81CFC400 Control Card and Ethernet Line
Cards” on page 107.
Note
Retain the tie wrap that comes with the power supply. You will use it
to secure the power cord to the chassis when you power on the unit
in “Powering On the AT-SBxPWRPOE1 Power Supply” on
page 146.
Vista de pagina 99
1 2 ... 95 96 97 98 99 100 101 102 103 104 105 ... 239 240

Comentarios a estos manuales

Sin comentarios