Allied-telesis SwitchBlade x3112 Manual de usuario Pagina 177

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 222
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 176
SwitchBlade x3112 Installation Guide
177
Figure 135. Removing the Terminal Screws
5. Position the power wires over the terminals and secure them to the
terminal block, with the terminal screws removed in step 4 and a #3
Phillips-head screwdriver. The positive terminal is on the left and the
negative terminal is on the right. Refer to Figure 136 on page 178.
Allied Telesis recommends tightening the screws to 30 to 40 inch-lbs.
Vista de pagina 176
1 2 ... 172 173 174 175 176 177 178 179 180 181 182 ... 221 222

Comentarios a estos manuales

Sin comentarios