Allied-telesis SwitchBlade x3112 Manual de usuario Pagina 165

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 222
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 164
SwitchBlade x3112 Installation Guide
165
Figure 119. Installing the Grounding Wire
5. Connect the other end of the grounding wire to the building protective
earth.
When installing this equipment, always ensure that the power supply
ground connection is installed first and disconnected last. E11
This system will work with a positive grounded or negative grounded
DC system. E13
Grounding
wire
Vista de pagina 164
1 2 ... 160 161 162 163 164 165 166 167 168 169 170 ... 221 222

Comentarios a estos manuales

Sin comentarios