Allied-telesis x610 Series Layer 3 Manual de usuario Pagina 85

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 120
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 84
x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
85
Cabling an
AT-x6EM/XS2
Stacking Module
1. Remove the dust plug from a transceiver slot on the switch, as shown
in Figure 47.
Figure 47. Removing a Dust Plug from a SFP+ Slot
2. Remove the transceiver
from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 48.
Figure 48. Installing an SFP+ Transceiver
R
PS
R
EADY
STAC KI NG
risk of
rvicing
AT-LX44CPUCVR
AT-x6EM/XS2
1 2
L/A
L/A
POWER
SFP+SFP+
CLASS 1
LASER PRODUCT
10G LINK
ACT
L/A
R
PS
R
EADY
STAC KI NG
risk of
rvicing
AT-LX44CPUCVR
AT-x6EM/XS2
12
L/A
L/A
POWER
SFP+SFP+
CLASS
1
LASER
PRODUC
T
10G LINK
ACT
L/A
Vista de pagina 84
1 2 ... 80 81 82 83 84 85 86 87 88 89 90 ... 119 120

Comentarios a estos manuales

Sin comentarios