Allied-telesis AT-PBC18 Manual de usuario Pagina 53

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 120
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 52
PowerBlade PBC18 Installation Guide
53
BNC
Termination
Switch
(AT-PB15 only)
The BNC Termination switch on the AT-PB15 offers 50 termination
without the use of a T-connector and 50 barrel terminator. Only end-
point nodes need 50 termination. Internal nodes on a thinnet
segment should be connected to the cable through standard 10Base2
T-connectors. Figure 22 shows the location of the BNC Termination
switch on the AT-PB15.
Figure 22 BNC Termination Switch
BNC TERMINATION
SWITCH
ON OFF
SW2
BNC TERMINATION
SWITCH
ON OFF
SW2
Vista de pagina 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 ... 119 120

Comentarios a estos manuales

Sin comentarios