Allied-telesis 8100S Series Manual de usuario Pagina 62

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 140
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 61
Chapter 3: Beginning the Installation
62
Installation Overview
Table 15 lists the installation procedures for a stack of 8100S Series
switches. The procedures should be performed in the order presented in
the table.
Table 15. Installation Procedures
Step Procedure
1 “Reviewing Safety Precautions” on page 63
2 “Planning the Installation” on page 67
3 “Unpacking the Switch” on page 69
4 “Installing the Switches in an Equipment Rack” on
page 72
5 “Labeling the Switches” on page 77
6 “Verifying and Setting the Stack ID Numbers” on page 82
7 “Cabling the Stacking Ports” on page 87
8 “Powering on AC Switches” on page 92 or “Powering On
DC Switches” on page 97
9 “Verifying the Installation” on page 101
10 “Cabling the Twisted Pair and Fiber Optic Ports” on
page 104
11 “Installing Optional SFP Transceivers” on page 106
Vista de pagina 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 139 140

Comentarios a estos manuales

Sin comentarios