Allied-telesis AT-GS950/10PS Manual de usuario Pagina 55

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 64
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 54
AT-GS950/10PS, AT-GS950/16PS, and AT-GS950/48PS Switches Installation Guide
55
Powering On the Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 29.
Figure 29. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord. E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible. E5
3. Verify that the POWER LED is green. If the LED is OFF, see Chapter
3, “Troubleshooting” on page 57.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, see one of the following
manuals:
AT-S110 Web Interface User’s Guide for the AT-GS950/10PS
Switch
AT-S111 Web Interface User’s Guide for the AT-GS950/48PS
Switch
AT-S112 Web Interface User’s Guide for the AT-GS950/16PS
Switch
Vista de pagina 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 63 64

Comentarios a estos manuales

Sin comentarios