Allied-telesis 9400 iMAP Manual de usuario Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 38
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
Connect System Cables Data Management Cable (MGMT Port on Control
Telesyn x400 - Installation Guide (Installation of ATI 9400)
1-26
1.18.3 Data Management Cable (MGMT Port on Control Module)
Note: Connect this cable only if the user plans to use the MGMT port for the management interface.
Refer to the ATI User Guide.
Follow the instructions included with the Control Module for placing the ferrite on the ethernet cable.
Connect one end of the ethernet cable to the MGMT port and connect the other end to a port that connects to the
TCP/IP network, as described in the ATI User Guide.
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Comentarios a estos manuales

Sin comentarios