Allied Telesis Switch AT-SBXPWRSYS1 Manual de usuario Pagina 179

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 222
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 178
SwitchBlade x3112 Installation Guide
179
Check to see if there are any exposed copper strands coming from
the installed wires. When this installation is done correctly there
should be no exposed copper wire strands extending from the
terminal block. Any exposed wiring can conduct harmful levels of
electricity to persons touching the wires. E12
6. With a #2 Phillips-head screwdriver, tighten the handle locking screw
to secure the power supply to the chassis. See Figure 137.
Figure 137. Tightening the Handle Locking Screw
7. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
8. Connect the power wires to the circuit breaker.
9. Turn the circuit breaker on.
10. Turn the On/Off switch on the power supply to the On position. See
Figure 138 on page 180.
Handle locking
screw
Vista de pagina 178
1 2 ... 174 175 176 177 178 179 180 181 182 183 184 ... 221 222

Comentarios a estos manuales

Sin comentarios