Allied Telesis Switch AT-SBXPWRSYS1 Manual de usuario Pagina 173

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 222
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 172
SwitchBlade x3112 Installation Guide
173
Figure 130. Tightening the Handle Locking Screw
8. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
9. Connect the power wires to the circuit breaker.
10. Turn the circuit breaker on.
11. Turn the On/Off switch on the power supply to the On position. See
Figure 131 on page 174.
Handle locking
screw
Vista de pagina 172
1 2 ... 168 169 170 171 172 173 174 175 176 177 178 ... 221 222

Comentarios a estos manuales

Sin comentarios