Allied Telesis AT-S82 Guía de instalación Pagina 42

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 52
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 41
Chapter 2: Installation
42
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green.
If the LED is OFF, refer to “Checking the POWER LED” on page 48.
The switch is now powered on and ready for network operations. To
start a remote management session on the switch, refer to “Starting a
Remote Management Session” on page 43.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord. E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible. E5
Vista de pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 51 52

Comentarios a estos manuales

Sin comentarios