Allied Telesis AT-S82 Guía de instalación Pagina 32

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 52
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 31
Chapter 2: Installation
32
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure that the following hardware components are included in the
package:
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four wall-mounting screws (stainless steel)
Four plastic anchors (for wall-mounting)
Four rubber feet (for desktop use)
One power cord
Documentation CD
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
Vista de pagina 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 51 52

Comentarios a estos manuales

Sin comentarios