Allied Telesis AT-FH705E Guía de instalación Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
5
Chapter 3
Troubleshooting
This chapter describes the procedures to test and troubleshoot the hub.
Connectivity Testing
In the following procedure, you will test each port for a valid connection and to
confirm the correct operation of the network.
1. Start with Ports 1 and 2. Connect these two ports of a single hub to two
nodes or workstations and turn on the hub’s power supply.
2. Make sure the Link/Activity and other LEDs of both hub ports are lit.
3. After confirming that Port 1 and Port 2 are operational, reconnect one of
the nodes/workstations to another port, then repeat this
communications test with the hub’s remaining ports. Continue to verify
the connection in each port by checking the Link/Activity and other
activity LEDs.
Note
When testing the 100 Mbps ports with Port 1 connected to a workstation,
set the button
WRýWKHý1RGH
position.
If the port is auto-negotiable, wait approximately 1-3 seconds for the process to
complete after power-on or after the cables are reconnected.
4. When cascading hubs using port 1, set the uplink slide switch to the
8SOLQNý
position.
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 23 24

Comentarios a estos manuales

Sin comentarios