Allied-telesis x510 Series Manual de usuario Pagina 109

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 122
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 108
x510 Series Installation Guide for Virtual Chassis Stacking
109
Figure 57. Installing an SFP or SFP+ Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining SFP or SFP+ transceivers in the line cards.
5. Remove the dust cover from the transceiver, as shown in Figure 58.
Figure 58. Removing the Dust Cover from an SFP or SFP+ Transceiver
6. Verify the position of the handle on the SFP transceiver. If the
transceiver is in a top slot, the handle should be in the upright position,
as shown in Figure 59 on page 110. If the transceiver is in a bottom
slot, the handle should be in the down position.
Vista de pagina 108
1 2 ... 104 105 106 107 108 109 110 111 112 113 114 ... 121 122

Comentarios a estos manuales

Sin comentarios