Allied-telesis AT-x510DP-52GTX Manual de usuario Pagina 99

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 129
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 98
x510DP-52GTX Installation Guide
99
4. Remove the dust cover from the transceiver, as shown in Figure 62 on
page 99.
Figure 62. Removing the Dust Cover from a Stacking Transceiver
5. Verify the position of the handle on the transceiver. If the transceiver is
in the S1 slot, the handle should be in the upright position, as shown in
Figure 63. If the transceiver is in the S2 slot, the handle should be in
the down position.
Figure 63. Positioning the Handle in the Upright Position
S2/28
S1/2
7
26
25
CON
SO
LE
SFP+
2689
S2/28
S1/27
26
25
CON
SO
LE
SFP+
2690
SFP Handle
Vista de pagina 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 ... 128 129

Comentarios a estos manuales

Sin comentarios