Pagina 1 - Installation Guide

613-001786 Rev. CSwitchBlade x3106Access Edge Chassis SwitchAT-SBx31CFC960Controller Fabric Card AT-SBx3106 Chassis AT-SBx31GT24 Line Card AT-SBx31

Pagina 2

List of Figures10Figure 46: Removing the Grounding Lug...

Pagina 3 - Industry Canada

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack100Figure 41. Lifting the AT-SBx3106 Chassis into the Equipment Rack3. With the bo

Pagina 4 - Translated Safety Statements

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1015. Tighten all six screws shown in Figure 43 to secure the chassis to th

Pagina 5 - Contents

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack102Removing the Shipping BraceNow that the chassis is installed on the table or in

Pagina 6

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide103Installing the Chassis Grounding LugThis procedure explains how to conne

Pagina 7

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack1043. Insert one end of the grounding wire into the grounding lug, as shown in Fig

Pagina 8

105Chapter 6Installing the Power SuppliesThis chapter explains how to install the power supplies. It has the following sections: “Protecting Against

Pagina 9

Chapter 6: Installing the Power Supplies106Protecting Against Electrostatic Discharge (ESD)To protect the equipment from damage by Electrostatic Disch

Pagina 10 - List of Figures

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide107Installing the AT-SBxPWRSYS1 AC System Power SupplyFor background inform

Pagina 11

Chapter 6: Installing the Power Supplies108Figure 51. Removing the Blank Slot Cover from Power Supply Slot C3. Remove the new AT-SBxPWRSYS1 AC Power S

Pagina 12

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide109Figure 52. Items Included with the AT-SBxPWRSYS1 Power Supply ModuleNote

Pagina 13

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide11Figure 101: Release Tab on the AT-SBx31XS6 Line Card ...

Pagina 14 - List of Tables

Chapter 6: Installing the Power Supplies110Figure 53. Verifying the AT-SBxPWRSYS1 AC Power Supply5. Move the locking handle on the AT-SBxPWRSYS1 AC Po

Pagina 15

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide111Figure 55. Inserting the AT-SBxPWRSYS1 AC Power Supply7. Lower the power

Pagina 16

Chapter 6: Installing the Power Supplies112Figure 56. Lowering the Handle on the AT-SBxPWRSYS1 AC Power Supply8. To install a second AT-SBxPWRSYS1 AC

Pagina 17 - Contacting Allied Telesis

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide113Installing the AT-SBxPWRPOE1 AC Power SupplyThis section contains the in

Pagina 18

Chapter 6: Installing the Power Supplies1143. Remove the power supply from the shipping package and verify that the shipping package contains the item

Pagina 19 - Supplies

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1154. Check the model name, shown in Figure 59, to verify the module.If you

Pagina 20 - Introduction

Chapter 6: Installing the Power Supplies116Figure 61. Inserting the AT-SBxPWRPOE1 AC Power Supply7. Lower the locking handle of the power supply modul

Pagina 21 - Figure 3. Fan Module

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide117Figure 62. Locking the Handle on the AT-SBxPWRPOE1 AC Power Supply8. To

Pagina 22 - AT-SBx3106 Chassis

Chapter 6: Installing the Power Supplies118Installing the AT-SBxPWRSYS1 DC Power SupplyThis section contains the installation procedure for the AT-SBx

Pagina 23

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide119Figure 63. Removing the Blank Slot Cover from Power Supply Slot C3. Remo

Pagina 24

List of Figures12Figure 153: SHOW FANMODULE Command... 21

Pagina 25 - Slots for the Power Supplies

Chapter 6: Installing the Power Supplies120Figure 64. Items Included with the AT-SBxPWRSYS1 DC Power Supply ModuleNoteStore the packaging material in

Pagina 26

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide121Figure 65. Loosening the Handle locking Screw on the AT-SBxPWRPOE1 DC Po

Pagina 27 - Power Supplies

Chapter 6: Installing the Power Supplies122Figure 67. Inserting the AT-SBxPWRSYS1 DC Power Supply7. Lower the locking handle of the power supply modul

Pagina 28

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide123Figure 68. Locking the Handle on the AT-SBxPWRSYS1 Power SupplyNoteDo no

Pagina 29

Chapter 6: Installing the Power Supplies124

Pagina 30 - AT-SBxFAN06 Module

125Chapter 7Installing the AT-SBx31CFC960 Card and Ethernet Line CardsThis chapter describes how to install the control and Ethernet line cards. The c

Pagina 31

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards126Guidelines to Handling the Controller and Line CardsPlease observe the followi

Pagina 32

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide127Figure 69. Aligning a Card in a SlotCORRECTINCORRECTINCORRECT

Pagina 33 - Chapter 2

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards128Installing the AT-SBx31CFC960 Controller Fabric CardThis section contains the

Pagina 34

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1292. Remove the new AT-SBx31CFC960 Card from the shipping package and veri

Pagina 35 - AT-SBx31GT24 Line Card

13Table 1. LEDs on the AT-SBxPWRSYS1 AC Power Supply ... 28Table 2. LEDs on t

Pagina 36

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards1304. Remove the battery insulator tab on the controller card by sliding it out f

Pagina 37 - AT-SBx31GT40 Line Card

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide131Figure 75. Aligning the AT-SBx31CFC960 Card in the Chassis Slot7. Slowly

Pagina 38

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards132Figure 76. Closing the Locking Levers on the AT-SBx31CFC960 Controller Fabric

Pagina 39

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide133Figure 77. Tightening the Thumb Screws on the AT-SBx31CFC960 Card10. Tig

Pagina 40 - AT-SBx31GP24 PoE Line Card

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards134Installing the Ethernet Line CardsThis section contains the installation proce

Pagina 41

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide135Figure 78. Removing an Ethernet Line Card from an Anti-static Bag4. Alig

Pagina 42

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards1365. Slowly and carefully slide the card into the slot.CautionKeep the card leve

Pagina 43 - AT-SBx31GS24 SFP Line Card

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide137Figure 81. Tightening the Thumb Screws on an Ethernet Line Card8. Tighte

Pagina 44

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards138Installing the Blank Slot CoversAfter installing the AT-SBx31CFC960 Controller

Pagina 45 - AT-SBx31GC40 Line Card

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide139Figure 83. Tightening the Thumbscrews on a Blank Slot Cover3. Tighten th

Pagina 46

List of Tables14

Pagina 47

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards140

Pagina 48

141Chapter 8Installing the Transceivers and Cabling the PortsThis chapter describes how to install the fiber optic transceivers and attach the cables

Pagina 49

Chapter 8: Installing the Transceivers and Cabling the Ports142Guidelines to Cabling the Twisted Pair Ports on the AT-SBx31GP24, AT-SBx31GT24, and AT-

Pagina 50

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide143The MDI/MDIX wiring configuration of the ports is set automatically with

Pagina 51 - AT-SBx31XZ4 XFP Line Card

Chapter 8: Installing the Transceivers and Cabling the Ports144NotePatch cables for the AT-SBx31GT40 Line Card, in lengths of 1 meter and 3 meters wit

Pagina 52

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide145Guidelines to Installing SFP, SFP+, CSFP, and XFP TransceiversPlease rev

Pagina 53 - AT-SBx31XS6 SFP+ Line Card

Chapter 8: Installing the Transceivers and Cabling the Ports146Installing SFP Transceivers in the AT-SBx31GS24 Line CardPlease review the information

Pagina 54

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1474. Slide the transceiver into the slot until it clicks into place, as sh

Pagina 55

Chapter 8: Installing the Transceivers and Cabling the Ports148NoteThe dust cover protects the fiber optic port on the SFP transceiver from dust conta

Pagina 56 - Requirements

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide149Installing SFP and CSFP Transceivers in the AT-SBx31GC40 Line CardPlease

Pagina 57 - Straight-through

15PrefaceThis guide contains the hardware installation instructions for the SwitchBlade x3106 switch. This preface contains the following sections: “

Pagina 58

Chapter 8: Installing the Transceivers and Cabling the Ports150Figure 92. Labels on SFP and CSFP Transceivers4. Slide the transceiver into the slot un

Pagina 59 - Powered Device

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide151Figure 94. Removing the Dust Cover from an SFP or a CSFP TransceiverNote

Pagina 60

Chapter 8: Installing the Transceivers and Cabling the Ports152Figure 95. Attaching a Fiber Optic Cable7. Repeat this procedure to install additional

Pagina 61

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide153 After cabling all the ports in the chassis, go to Chapter 9, “Powering

Pagina 62

Chapter 8: Installing the Transceivers and Cabling the Ports154Installing SFP+ Transceivers in the AT-SBx31XS6 Line CardPlease review the information

Pagina 63

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1552. Orient the SFP+ transceiver with the handle on top, as shown in Figur

Pagina 64 - Hardware Components

Chapter 8: Installing the Transceivers and Cabling the Ports156Figure 99. Removing the Dust Cover from an SFP+ Transceiver in the AT-SBx31XS6 Line Car

Pagina 65

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide157Figure 100. Attaching a Fiber Optic Cable to an SFP+ Transceiver in the

Pagina 66

Chapter 8: Installing the Transceivers and Cabling the Ports158Installing AT-SP10TW Cables in the AT-SBx31XS6 Line CardThis procedure explains how to

Pagina 67

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide159Figure 102. Installing the AT-SP10TW Cable in the AT-SBx31XS6 Line Card4

Pagina 68 - Dual Controller Cards

Preface16Safety Symbols Used in this DocumentThis document uses the following conventions.NoteNotes provide additional information.CautionCautions inf

Pagina 69 - SYS Status LEDs

Chapter 8: Installing the Transceivers and Cabling the Ports160Installing XFP Transceivers in the AT-SBx31XZ4 Line CardPlease review the information i

Pagina 70

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide161Figure 104. Handle on the XFP Transceiver4. Slide the transceiver into t

Pagina 71 - SBx Linecard Status LEDs

Chapter 8: Installing the Transceivers and Cabling the Ports162Figure 106. Removing the Protective Cover from an XFP Transceiver in the AT-SBx31XZ4 Li

Pagina 72 - SFP+ Slots

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide163Figure 107. Attaching a Fiber Optic Cable to an XFP Transceiver in the A

Pagina 73 - Console (RS-232) Port

Chapter 8: Installing the Transceivers and Cabling the Ports164Cabling the NET MGMT Port on the AT-SBx31CFC960 CardThe controller card must have acces

Pagina 74 - NET MGMT Port

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide165cable. Here are the guidelines to choosing a straight-through or crossov

Pagina 75

Chapter 8: Installing the Transceivers and Cabling the Ports166Installing SFP or SFP+ Transceivers in the AT-SBx31CFC960 CardThe AT-SBx31CFC960 Contro

Pagina 76 - Port LED

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide167Figure 109. Handle on an SFP or SFP+ Transceiver3. Slide the transceiver

Pagina 77 - USB Port

Chapter 8: Installing the Transceivers and Cabling the Ports168Figure 111. Removing the Dust Cover from an SFP or SFP+ Transceiver in the AT-SBx31CFC9

Pagina 78 - Reset Button

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1696. Repeat this procedure to install additional SFP or SFP+ transceivers

Pagina 79

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide17Contacting Allied TelesisIf you need assistance with this product, you ma

Pagina 80

Chapter 8: Installing the Transceivers and Cabling the Ports170

Pagina 81 - Chapter 4

171Chapter 9Powering On the ChassisThis chapter describes how to power on the chassis, monitor the initialization process, and confirm the operational

Pagina 82 - Reviewing Safety Precautions

Chapter 9: Powering On the Chassis172Verifying the InstallationPlease perform the following procedure before powering on the chassis:1. Verify that th

Pagina 83

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide173Powering On the AT-SBxPWRSYS1 AC Power SupplyThe procedure in this secti

Pagina 84

Chapter 9: Powering On the Chassis174Figure 114. Connecting the AC Power Cord for the AT-SBxPWRSYS1 Power Supply 3. Use the twist tie included with th

Pagina 85

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide175Figure 115. Securing the Power Cord for the AT-SBxPWRSYS1 Power Supply t

Pagina 86

Chapter 9: Powering On the Chassis176Powering on the AT-SBxPWRPOE1 AC Power SupplyThis section contains instructions on how to power on the AT-SBxPWRP

Pagina 87

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide177Figure 117. Securing the Power Cord for the AT-SBxPWRPOE1 Power Supply t

Pagina 88

Chapter 9: Powering On the Chassis178Figure 118. Dress and Secure AC Power Cords6. Go to “Monitoring the Initialization Process” on page 203.

Pagina 89 - Equipment Rack

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide179Powering On the AT-SBxPWRSYS1 DC System Power SupplyThis section contain

Pagina 90

Preface18

Pagina 91

Chapter 9: Powering On the Chassis180Figure 119. Components of the AT-SBxPWRSYS1 DC Power SupplyWarningAs a safety precaution, install a circuit break

Pagina 92

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide181Choosing aMethod forAttaching theGrounding WireYou may attach the ground

Pagina 93 - Preparing the

Chapter 9: Powering On the Chassis1823. Use an 8 mm wrench to remove the grounding post nut and washer, shown in Figure 123, from the power supply.Fig

Pagina 94 - 342.4 mm (13.5”)

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide183Figure 124. Installing the Grounding Wire5. Connect the other end of the

Pagina 95 - Rubber Feet

Chapter 9: Powering On the Chassis184Connecting theGrounding Wirewith Bare WireTo attach the grounding wire to the power supply with bare wire, perfor

Pagina 96 - Brackets

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide185Figure 127. Securing the Bare Grounding Wire to the Grounding PostChoosi

Pagina 97

Chapter 9: Powering On the Chassis186You may also install the wires using bare wires.Here are the procedures to wiring the positive and negative termi

Pagina 98

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide187Figure 130. Attaching the Power Wires to the Power Terminal Lugs3. Verif

Pagina 99 - Chassis in the

Chapter 9: Powering On the Chassis188Figure 132. Opening the Plastic Cover5. Use a #3 Phillips-head screwdriver to remove the two screws from the posi

Pagina 100

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide1896. With a #3 Phillips-head screwdriver, connect the positive (+) power l

Pagina 101 - 10 inch-lbs

19Chapter 1Overview of the Chassis and Power SuppliesThis chapter provides an overview of the hardware components of the AT-SBx3106 Chassis and power

Pagina 102 - Removing the Shipping Brace

Chapter 9: Powering On the Chassis190Figure 135. Connecting the Negative (-) Power Wire with a Straight TerminalWarningCheck to see if there are any e

Pagina 103

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide191Figure 136. Closing the Plastic Cover over the Terminal ConnectorsCautio

Pagina 104

Chapter 9: Powering On the Chassis192Figure 137. Tightening the Handle Locking Screw10. Before attaching the power wires from the power supply to the

Pagina 105 - Installing the Power Supplies

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide193Connecting theDC Power Wireswith the RightAngle TerminalsTo connect the

Pagina 106

Chapter 9: Powering On the Chassis1944. Using a #1 Phillips-head screwdriver, remove the two screws that secure the plastic cover over the positive an

Pagina 107

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide195Figure 141. Removing the Terminal Screws6. With a #3 Phillips-head screw

Pagina 108

Chapter 9: Powering On the Chassis196Figure 142. Connecting the Positive (+) Power Wire with a Right Angle Terminal7. With a #3 Phillips-head screwdri

Pagina 109

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide197Figure 143. Connecting the Negative (-) Power Wire with a Right Angle Te

Pagina 110

Chapter 9: Powering On the Chassis198Figure 144. Tightening the Handle Locking Screw9. Before attaching the power wires from the power supply to the c

Pagina 111

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide199Connecting BareDC Power WiresTo attach bare lead wires to the positive a

Pagina 112

Copyright  2013 Allied Telesis, Inc.All rights reserved. No part of this publication may be reproduced without prior written permission from Allied T

Pagina 113

Chapter 1: Overview of the Chassis and Power Supplies20IntroductionThe SBx3106 product is a modular Gigabit and 10 Gigabit Ethernet switch. The main c

Pagina 114

Chapter 9: Powering On the Chassis200Figure 146. Connecting the Positive Wire6. Wrap the negative lead wire clockwise around the remaining terminal sc

Pagina 115

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide201Figure 147. Connecting the Negative Lead WireAllied Telesis recommends t

Pagina 116

Chapter 9: Powering On the Chassis2029. Before attaching the power wires from the power supply to the circuit breaker in the wiring closet, check that

Pagina 117

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide203Monitoring the Initialization ProcessThe control and line cards perform

Pagina 118

Chapter 9: Powering On the Chassis204the active card does the inactive card begin to forward packets on the backplane.The phases of the initialization

Pagina 119

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide205software. The same LED on the inactive LED continues to flash amber unti

Pagina 120

Chapter 9: Powering On the Chassis206Figure 149. Switch Initialization Messages (Continued)Loading vxWorks.bin.gz...(13512734 bytes)Starting at 0x1000

Pagina 121

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide207Figure 150. Switch Initialization Messages (Continued)VxWorks Version 6.

Pagina 122

Chapter 9: Powering On the Chassis208

Pagina 123

209Chapter 10Verifying the Hardware Operations of the ChassisThis chapter describes how to verify the operations of the chassis. The chapter contains

Pagina 124

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide21The fan module is shown in Figure 3.Figure 3. Fan ModuleAT-SBxFAN06 Modul

Pagina 125 - Chapter 7

Chapter 10: Verifying the Hardware Operations of the Chassis210Using the LEDs to Verify the ChassisAfter powering on the chassis for the first time an

Pagina 126

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide2115. To check the status of the Ethernet line cards, inspect the SBx Statu

Pagina 127 - INCORRECT

Chapter 10: Verifying the Hardware Operations of the Chassis212Using Local Management to Verify the ChassisThis section explains how to confirm the op

Pagina 128

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide213 Data bits: 8 Parity: None Stop bits: 1 Flow control: None NoteThe p

Pagina 129

Chapter 10: Verifying the Hardware Operations of the Chassis214The module is operating normally when its state is UP-UP-ONLINE, as shown in Figure 153

Pagina 130

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide215NoteIf a controller card has a state of UP-UP-DEGRADED and a fault of Mi

Pagina 131

Chapter 10: Verifying the Hardware Operations of the Chassis216Running the Easy Startup ApplicationThe AT-SBx31CFC960 Controller Fabric Card has an Ea

Pagina 132 - Controller Fabric Card

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide217The second management access method is referred to as in-band management

Pagina 133

Chapter 10: Verifying the Hardware Operations of the Chassis218 The Easy Startup application is only available when the controller card is in its def

Pagina 134

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide219LEDs. The LEDs are green on the active card and amber on the standby car

Pagina 135

Chapter 1: Overview of the Chassis and Power Supplies22AT-SBx3106 ChassisThe AT-SBx3106 Chassis is a 4RU unit with slots for four Ethernet line cards

Pagina 136

Chapter 10: Verifying the Hardware Operations of the Chassis220

Pagina 137

221Chapter 11Upgrading AT-SBx31CFC to AT-SBx31CFC960 Controller Fabric CardsThis chapter explains how to upgrade the AT-SBx3106 Chassis to the AT-SBx3

Pagina 138

Chapter 11: Upgrading AT-SBx31CFC to AT-SBx31CFC960 Controller Fabric Cards222GuidelinesHere are the guidelines to upgrading the AT-SBx3106 Chassis to

Pagina 139

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide223Upgrading the Controller Fabric CardsTo upgrade the chassis from AT-SBx3

Pagina 140

Chapter 11: Upgrading AT-SBx31CFC to AT-SBx31CFC960 Controller Fabric Cards2244. Power off the AT-SBx3106 Chassis.5. Remove the AT-SBx31CFC Card from

Pagina 141 - Chapter 8

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide225NoteThe AT-SBx31CFC960 Controller Fabric Card does not support versions

Pagina 142

Chapter 11: Upgrading AT-SBx31CFC to AT-SBx31CFC960 Controller Fabric Cards226NoteIf in step 15 you included the OUTPUT option with the RESTORE CONFIG

Pagina 143 - SBx31GT40 Line

227Chapter 12TroubleshootingThis chapter contains information on how to troubleshoot the SwitchBlade x3106 product.NoteIf you are unable to resolve a

Pagina 144

Chapter 12: Troubleshooting228AT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power SuppliesA power supply is operating normally when its AC and DC LEDs are solid

Pagina 145

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide229Fault Condition 4: If the LEDs on the power supply indicate normal opera

Pagina 146

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide23Figure 5. Rear View of the AT-SBx3106 ChassisFigure 6 is an example of a

Pagina 147

Chapter 12: Troubleshooting230AT-SBxPWRSYS1 DC Power SupplyIf you suspect a problem with the DC power supply, examine its LEDs. The power supply is op

Pagina 148

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide231supply interfaces (opto-couplers) on the rear panel of the chassis. For

Pagina 149

Chapter 12: Troubleshooting232Ethernet Line CardsA quick and easy way to check the overall heath of the Ethernet line cards in the chassis is by exami

Pagina 150

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide233Command has been submittedofficer SEC>> Try installing the card i

Pagina 151

Chapter 12: Troubleshooting234Twisted Pair PortsThe ports on the AT-SBx31GT24 and AT-SBx31GP24 Line Cards have L/A LEDs that are solid or flashing gre

Pagina 152

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide235 The ports must be set to Auto-Negotiation, the default setting, to ope

Pagina 153

Chapter 12: Troubleshooting236Power Over EthernetThis section applies only to the AT-SBx31GP24 Line Card. The ports on the line card have two LEDs eac

Pagina 154

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide237 Use the SHOW POE CARD command to determine whether the switch has reac

Pagina 155

Chapter 12: Troubleshooting238Fiber Optic TransceiversThe L/A LEDs on the AT-SBx31GS24, AT-SBx31GC40, AT-SBx31XS6, and AT-SBx31XZ4 Line Cards are soli

Pagina 156

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide239and network device. The devices must be transmitting and receiving on op

Pagina 157

Chapter 1: Overview of the Chassis and Power Supplies24Slots for the Ethernet Line and Controller CardsThe chassis has slots for four Ethernet line ca

Pagina 158

Chapter 12: Troubleshooting240AT-SBx31CFC960 Controller Fabric CardIf the chassis has one controller card and it fails, all network operations stop. T

Pagina 159

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide241the controller card from the unit and remove the insulator. The controll

Pagina 160

Chapter 12: Troubleshooting242flashing amber on the inactive master card. Check to be sure that the operating parameters on the terminal or the termi

Pagina 161

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide243AT-SBxFAN06 Fan ModuleThe AT-SBxFAN06 Fan Module is operating correctly

Pagina 162

Chapter 12: Troubleshooting244Local (Out-of-Band) Management SessionIf you are unable to establish a local (out-of-band) management session with the s

Pagina 163

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide245Power Supply Interfaces (Opto-couplers)The two power supply interfaces i

Pagina 164

Chapter 12: Troubleshooting246

Pagina 165

247Chapter 13Replacing ModulesThis chapter contains procedures on how to replace modules in the chassis. The chapter contains the following sections:

Pagina 166

Chapter 13: Replacing Modules248Replacing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power SuppliesThis section contains the procedure for removing AT-SBxPWRS

Pagina 167

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide249Figure 155. Disconnecting the AC Power Cord from the AC Socket on the Ba

Pagina 168

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide25Slots for the Power SuppliesThe chassis has four power supply slots, labe

Pagina 169

Chapter 13: Replacing Modules250Figure 156. Lifting the Locking Handle on the Power Supply3. Carefully pull on the locking handle to slide the power s

Pagina 170

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide251Figure 157. Removing the Power Supply from the Chassis4. Do one of the f

Pagina 171 - Powering On the Chassis

Chapter 13: Replacing Modules252Figure 158. Installing a Blank Power Supply Slot Cover6. Lower the locking handle to secure the slot cover in the slot

Pagina 172 - Verifying the Installation

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide253Figure 159. Lowering the Locking Handle on the Power Supply Slot Cover

Pagina 173

Chapter 13: Replacing Modules254Replacing the AT-SBxPWRSYS1 DC Power SupplyThis section contains the procedure for removing an AT-SBxPWRSYS1 DC Power

Pagina 174 - Power Supply

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide255Figure 160. Loosening the Screw on the Locking HandleNoteIf the power wi

Pagina 175

Chapter 13: Replacing Modules256Figure 161. Opening the Plastic Window on the Terminal Block5. Use a #3 screwdriver to remove the negative (-) lead wi

Pagina 176

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide257Figure 162. Removing the Negative Lead Wire6. Use a #3 screwdriver to re

Pagina 177

Chapter 13: Replacing Modules258Figure 163. Removing the Positive Lead Wire from the Terminal Block7. Reinstall the two screws on the negative (-) and

Pagina 178

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide259Figure 164. Reinstalling the Screws on the Positive and Negative Termina

Pagina 179

Chapter 1: Overview of the Chassis and Power Supplies26NoteThe AT-SBxPWRSYS1 DC Power Supply is not compatible with the AT-SBxPWRSYS1 AC or AT-SBxPWRP

Pagina 180

Chapter 13: Replacing Modules260Figure 165. Closing the Plastic Cover9. Use an 8 mm wrench to remove the grounding wire from the grounding post. Refer

Pagina 181

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide261Figure 166. Removing the Grounding Wire10. Reinstall the nut and washer

Pagina 182

Chapter 13: Replacing Modules262Figure 167. Reinstalling the Nut and Washer on the Grounding Post11. Lift the locking handle and slide the power suppl

Pagina 183

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide263Figure 168. Lifting the Locking Handle and Removing the Power Supply12.

Pagina 184 - Grounding Wire

Chapter 13: Replacing Modules264Figure 169. Installing a Blank Power Supply Slot Cover14. Lower the locking handle to secure the slot cover to the slo

Pagina 185 - Power Wires

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide265Figure 170. Lowering the Locking Handle on the Power Supply Slot Cover

Pagina 186 - Terminals

Chapter 13: Replacing Modules266Replacing Ethernet Line CardsThis section contains the procedure for replacing Ethernet line cards in the chassis.Note

Pagina 187

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide2678. Carefully pull on the screws to disconnect the line card from the con

Pagina 188

Chapter 13: Replacing Modules2684. At the command prompt, enter the ENABLE CARD command to enable the slot with the new card. For example, to enable t

Pagina 189

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide269Replacing the AT-SBx31CFC960 Controller Fabric CardThis section contains

Pagina 190

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide27Power SuppliesHere are the three power supplies for the chassis: AT-SBxP

Pagina 191

Chapter 13: Replacing Modules2707. Verify that the management card has the desired version of the management software by performing the SHOW SYSTEM co

Pagina 192

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide2717. Install the new controller card. For instructions, refer to “Installi

Pagina 193 - Angle Terminals

Chapter 13: Replacing Modules272Replacing the AT-SBxFAN06 Fan ModuleThis section contains the procedures for replacing the AT-SBxFAN06 Fan Module. The

Pagina 194

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide273Figure 171. Loosening the Screw on the AT-SBxFAN06 Fan Module6. Carefull

Pagina 195

Chapter 13: Replacing Modules2747. Slowly pull the module out 25 mm (1 in.). Refer to Figure 173.WarningThe fan module has hazardous moving parts. Kee

Pagina 196

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide275Figure 174. Removing the AT-SBxFAN06 Fan Module from the ChassisInstalli

Pagina 197

Chapter 13: Replacing Modules276Figure 175. Installing a New AT-SBxFAN06 Fan Module2. When you feel the fan module make contact with the connector on

Pagina 198

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide277Figure 176. Securing the AT-SBxFAN06 Fan Module on the Backplane Connect

Pagina 199 - Connecting Bare

Chapter 13: Replacing Modules278NotePerform steps 5 to 7 to enable the new fan module if you disabled the old module with the DISABLE FANMODULE comman

Pagina 200

279Appendix ATechnical SpecificationsPhysical SpecificationsDimensions (W x D x H)Weight (Kilograms)Table 25. Product DimensionsAT-SBx3106 Chassis 4

Pagina 201

Chapter 1: Overview of the Chassis and Power Supplies28NoteThe AT-SBxPWRSYS1 DC Power Supply is not compatible with the AT-SBxPWRSYS1 AC or AT-SBxPWRP

Pagina 202

Appendix A: Technical Specifications280AT-SBx31GP24 PoE Line Card 1.06 kg (2.34 lb)AT-SBx31GS24 SFP Line Card 1.06 kg (2.34 lb)AT-SBx31GC40 Line Card

Pagina 203

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide281Environmental SpecificationsNoteThe acoustic noise was measured at 40° C

Pagina 204 - Initialization

Appendix A: Technical Specifications282Power SpecificationsAC Voltage, Frequency Requirements (Volts, Hertz)DC Voltage RequirementTypical power saving

Pagina 205 - Port to Monitor

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide283Maximum power supply efficiency (based on 100V input voltage)Heat dissip

Pagina 206

Appendix A: Technical Specifications284Available Power over Ethernet (Watts/port):PoE ModeTable 35. Available Power Over Ethernet with One PoE Power

Pagina 207

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide285Safety and Electromagnetic Emissions CertificationsSafety and Electromag

Pagina 208

Appendix A: Technical Specifications286Port PinoutsThis section lists the port pinouts for the AT-SBx31GT24, AT-SBx31GT40, and AT-SBx31GP24 Line Cards

Pagina 209 - Chapter 10

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide287Table 41 lists the pin signals when a 10/100/1000Base-T port is operatin

Pagina 210

Appendix A: Technical Specifications288

Pagina 211

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide29The LEDs on the AT-SBxPWRPOE1 AC Power Supply are described in Table 3.Ta

Pagina 212 - Management

3Electrical Safety and Emissions StandardsThis product meets the following standards.EMI/RFI Emissions: FCC Class A, EN55022 Class A, EN61000-3-2, EN6

Pagina 213 - Commands

Chapter 1: Overview of the Chassis and Power Supplies30AT-SBxFAN06 ModuleThe AT-SBxFAN06 Module is the cooling unit for the chassis. It is a field- re

Pagina 214

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide31Power Supply Interfaces (Opto-couplers)The chassis has two power supply i

Pagina 215

Chapter 1: Overview of the Chassis and Power Supplies32

Pagina 216

33Chapter 2Overview of the Ethernet Line CardsThe sections in this chapter describe the Ethernet line cards for the AT-SBx3106 Chassis: “Ethernet Lin

Pagina 217

Chapter 2: Overview of the Ethernet Line Cards34Ethernet Line CardsThe Ethernet line cards are shown in Figure 11.Figure 11. Ethernet Line CardsAT-SBx

Pagina 218

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide35AT-SBx31GT24 Line CardThe AT-SBx31GT24 Line Card, shown in Figure 12, is

Pagina 219

Chapter 2: Overview of the Ethernet Line Cards36Figure 13. Port LEDs on the AT-SBx31GT24 Line CardTable 6. Port LEDs on the AT-SBx31GT24 Line CardLE

Pagina 220

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide37AT-SBx31GT40 Line CardThe AT-SBx31GT40 Line Card, shown in Figure 14, is

Pagina 221 - Upgrading AT-SBx31CFC to AT

Chapter 2: Overview of the Ethernet Line Cards38LEDs The LEDs for the ports on the AT-SBx31GT40 Line Card are found on the RJ point 5 cable connectors

Pagina 222 - Guidelines

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide39Table 7. Port LEDs for the AT-SBx31GT40 Line CardLED State DescriptionL

Pagina 223

4Translated Safety StatementsImportant: The  indicates that a translation of the safety statement is available in a PDF document titled “Translated S

Pagina 224

Chapter 2: Overview of the Ethernet Line Cards40AT-SBx31GP24 PoE Line CardThe AT-SBx31GP24 PoE Line Card, shown in Figure 17, is a Gigabit Ethernet sw

Pagina 225

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide41LEDs Each port on the AT-SBx31GP24 PoE Line Card has two LEDs. The LEDs a

Pagina 226

Chapter 2: Overview of the Ethernet Line Cards42PoE Off This LED state can result from the following conditions: The port is not connected to a PD.

Pagina 227 - Troubleshooting

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide43AT-SBx31GS24 SFP Line CardThe AT-SBx31GS24 SFP Line Card, shown in Figure

Pagina 228

Chapter 2: Overview of the Ethernet Line Cards44Figure 20. Port LEDs on the AT-SBx31GS24 SFP Line CardTable 9. Port LEDs on the AT-SBx31GS24 SFP Lin

Pagina 229

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide45AT-SBx31GC40 Line CardThe AT-SBx31GC40 Line Card, shown in Figure 21, is

Pagina 230 - AT-SBxPWRSYS1 DC Power Supply

Chapter 2: Overview of the Ethernet Line Cards46NoteThe AT-SBx31GC40 Line Card does not support 10 or 100 Mbps transceivers.The AT-SBx31GC40 Line Card

Pagina 231

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide47Figure 22. Port Numbers for Slots with CSFP TransceiversIn contrast, the

Pagina 232 - Ethernet Line Cards

Chapter 2: Overview of the Ethernet Line Cards48Figure 23. Port Numbers for Slots with Standard SFP TransceiversLEDs The AT-SBx31GC40 Line Card has tw

Pagina 233

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide49The third and fourth LEDs display the same information for ports 3 and 2,

Pagina 235

Chapter 2: Overview of the Ethernet Line Cards50Table 10. Transceiver Slot LEDs on the AT-SBx31GC40 Line CardLED State DescriptionL/ASolid Green The

Pagina 236 - Power Over Ethernet

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide51AT-SBx31XZ4 XFP Line CardThe AT-SBx31XZ4 XFP Line Card, shown in Figure 2

Pagina 237

Chapter 2: Overview of the Ethernet Line Cards52Figure 28. Transceiver Slot LEDs on the AT-SBx31XZ4 XFP Line CardTable 11. Transceiver Slot LEDs on

Pagina 238 - Fiber Optic Transceivers

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide53AT-SBx31XS6 SFP+ Line CardThe AT-SBx31XS6 Line Card, shown in Figure 29,

Pagina 239

Chapter 2: Overview of the Ethernet Line Cards54Figure 30. SFP+ Slot LEDs on the AT-SBx31XS6 Line CardTable 12. SFP+ Slot LEDs on the AT-SBx31XS6 Li

Pagina 240 - Chapter 12: Troubleshooting

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide5510/100/1000Base-T Twisted Pair PortsThis section applies to the 10/100/10

Pagina 241

Chapter 2: Overview of the Ethernet Line Cards56MaximumDistanceThe ports have a maximum operating distance of 100 meters (328 feet).CableRequirementsT

Pagina 242

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide57Automatic MDIXDetectionThe 10/100/1000 Mbps twisted-pair ports on the AT-

Pagina 243 - AT-SBxFAN06 Fan Module

Chapter 2: Overview of the Ethernet Line Cards58 You may use straight-through or crossover cables on ports that are connected to network devices that

Pagina 244

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide59Power over Ethernet on the AT-SBx31GP24 Line CardThis section applies onl

Pagina 245

Contents6Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card ... 63Hardware Components .

Pagina 246

Chapter 2: Overview of the Ethernet Line Cards60Power Budgeting The power for PoE is provided on the ports of the AT-SBx31GP24 Line Cards is provided

Pagina 247 - Replacing Modules

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide61The PoE implementation on the AT-SBx31GP24 Line Card is Alternative A, in

Pagina 248

Chapter 2: Overview of the Ethernet Line Cards62

Pagina 249 - Back Panel

63Chapter 3Overview of the AT-SBx31CFC960 Controller Fabric CardThe sections in this chapter describe the AT-SBx31CFC960 Controller Fabric Card: “Har

Pagina 250 - Chapter 13: Replacing Modules

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card64Hardware ComponentsThe components on the controller card are identified in Figure 31

Pagina 251

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide65Four slots for 1000Mbps SFP or 10Gbps SFP+ TransceiversSupports 1000Mbps

Pagina 252 - Figure 159 on page 253

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card66GuidelinesHere are a few of the functions of the controller card: Chassis managemen

Pagina 253

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide67 Power-saving eco-friendly button for turning the port and status LEDs o

Pagina 254

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card68Dual Controller CardsYou may install either one or two controller cards in the chass

Pagina 255

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide69SYS Status LEDsThe SYS (System) Status LEDs on the AT-SBx31CFC960 Control

Pagina 256 - 162 on page 257

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide7Chapter 9: Powering On the Chassis ...

Pagina 257

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card70eco-friendly ButtonThe eco-friendly button on the controller card is used to turn th

Pagina 258

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide71SBx Linecard Status LEDsThe SBx Linecard Status LEDs display general stat

Pagina 259

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card72SFP+ SlotsThe four SFP+ slots on the front panel of the controller card can support

Pagina 260

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide73Console (RS-232) PortThe Console Port on the front panel of the controlle

Pagina 261 - 167 on page 262

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card74NET MGMT PortThe controller card must have access to your network to perform the fea

Pagina 262

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide75The NET MGMT port has a standard RJ-45 8-pin connector and operates at 10

Pagina 263

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card76through or crossover cabling for the port: You may use a straight-through cable to

Pagina 264 - Figure 170 on page 265

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide77USB PortThe USB port is used for the following management functions: Sto

Pagina 265

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card78Reset ButtonYou may use the Reset button to reset either the controller card or all

Pagina 266 - Replacing Ethernet Line Cards

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide79NoteThe available backplane bandwidth for each line card slot is reduced

Pagina 267

Contents8

Pagina 268

Chapter 3: Overview of the AT-SBx31CFC960 Controller Fabric Card80Release Activation and Feature LicensesThe AT-SBx31CFC960 Card uses two types of sof

Pagina 269

81Chapter 4Safety Precautions and Site PreparationThis chapter contains the safety precautions and guidelines for selecting a site for the chassis. Th

Pagina 270

Chapter 4: Safety Precautions and Site Preparation82Reviewing Safety PrecautionsPlease review the following safety precautions before you begin to ins

Pagina 271

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide83NotePluggable Equipment. The socket outlet shall be installed near the eq

Pagina 272 - Fan Module

Chapter 4: Safety Precautions and Site Preparation84WarningMounting of the equipment in the rack should be such that a hazardous condition is not crea

Pagina 273 - Connector

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide85WarningReliable earthing of rack-mounted equipment should be maintained.

Pagina 274

Chapter 4: Safety Precautions and Site Preparation86Selecting a Site for the SwitchBlade x3106Please perform the following procedure to determine the

Pagina 275 - Installing a New

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide87America, have 20 Amp, 125 V NEMA 5-20P plugs. The plug is only compatible

Pagina 276

Chapter 4: Safety Precautions and Site Preparation88Installation Tools and MaterialHere are the tools and material you need to provide to install the

Pagina 277

89Chapter 5Installing the Chassis on a Table or in an Equipment RackThis chapter describes how to install the AT-SBx3106 Chassis on a table or in an e

Pagina 278

9FiguresFigure 1: AT-SBx3106 Chassis ...

Pagina 279 - Technical Specifications

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack90Unpacking the AT-SBx3106 ChassisTo unpack the AT-SBx3106 Chassis, perform the fo

Pagina 280

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide91Figure 34. AT-SBx3106 Chassis Items (Continued)3. Do one of the following

Pagina 281 - Environmental Specifications

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack92Installing the Chassis on a TableThis section contains the procedure for install

Pagina 282 - Power Specifications

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide93Installing the Chassis in an Equipment RackThe following sections contain

Pagina 283

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack94Figure 35. Reserving Vertical Rack Space3. Identify the lowest 1/2” screw hole p

Pagina 284 - PoE Mode

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide95Figure 36. Rack Mounting Hole Locations5. After installing the two screws

Pagina 285

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack96Figure 37. Turning the Chassis Upside Down2. Using a flat-head screwdriver, pry

Pagina 286 - Port Pinouts

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide97 Position F installs the chassis with the rear panel flush with the fron

Pagina 287

Chapter 5: Installing the Chassis on a Table or in an Equipment Rack98Figure 39. Rack Mounting Bracket LocationsFigure 40. Rack Bracket Locations for

Pagina 288

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide99Installing theChassis in theEquipment RackThe procedure in this section e

Modelos relacionados SwitchBlade x3106

Comentarios a estos manuales

Sin comentarios