
AT-FS705LE Installation Guide
21
Warning
The power cord is used as a
disconnection device. To de-energize
equipment, disconnect the power cord.
5
6. Verify that either the PWR LED is green. If
the LED is OFF, refer to “Troubleshooting” on
page 27 for instructions.
Note
The switch perform a self-diagnostic test
upon power up. This takes about 20
seconds to complete.
7. Power ON the end-nodes connected to the
switch.
8. Check that all the LINK/ACT LEDs are
green. If any of the LEDs is OFF, refer to
“Troubleshooting” on page 27 for
instructions.
The switch is now ready for use.
Comentarios a estos manuales