Allied-telesis AT-CV1000 Manual de usuario Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 42
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
AT-CV1000 One-Slot Chassis Installation Guide
33
4. Locate the alignment guides on both sides of the slot, as shown in
Figure 17.
Figure 17. Location of the Alignment Guides
5. Align the back edge of the line card with the left and right alignment
guides located inside the slot.
6. Slide the line card into the slot, as shown in Figure 18, until the slot
cover is flush with the front of the chassis.
Figure 18. Inserting a Line Card
505
AT-CV1000
Alignment Guides
CLA
SS
1
LAS
ER
PRO
DUC
T
AT
-CV100
0
232
AT-CM202
LK A
T
LK
AT FD
SML
ML
OAM
R
D
Y
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 41 42

Comentarios a estos manuales

Sin comentarios